GPT Image 2 | Spanish UPS Outlet Wiring Infographic

电商详情页与商业海报设计

This prompt converts a UPS reference photo into an instructional diagram with Spanish annotations, clearly showing which outlets to use for critical devices and where to move the switch.

Using the provided APC Back-UPS reference image, convert it into a clear Spanish-annotated setup guide overlaid directly on the photo. Keep the UPS photo realistic and unchanged as the base layer, but add color-coded annotations to show which outlets are battery-backed and which provide only surge protection. At the top, add 2 title boxes: a dark gray box on the left with the text "SOLO PROTECCIÓN (sin batería)", and a green box on the right with the text "CON BATERÍA (recomendado para equipos críticos)". Highlight the 4 outlets on the right with a green outline group and individual green outlines, and place 4 numbered green labels on the right: "1 Servidor 1", "2 Servidor 2", "3 Servidor 3", "4 Switch (mover aquí)". On the left, highlight the currently used upper-left outlet with an orange outline, and add an orange callout box with the text "Switch: mover de aquí", along with a curved arrow pointing from this outlet to the bottom outlet of the green group on the right. Additionally, outline the 3 outlets on the lower left with a light gray, and add 3 gray labels aligned on the left: "Solo protección (sin batería)", "No crítico", and "Libre / periféricos". At the bottom, add a large yellow warning box with a warning icon, with the following text: "Ojo: 3 servidores + 1 switch pueden sobrecargar un Back-UPS ES 700. Si pita o se apaga al probarlo, necesitas un SAI más potente." Use a clean infographic style, with crisp readable bold typography, neat rounded rectangles, high contrast, and practical IT diagram presentation.

YouMind · GPT Image 2 · 提示词 · 模板 · 界面设计 · 热门提示词 · twitter · 西班牙语

在云端节点画布套用同款工作流 · 打开 Studio Chat 对话改图 · 返回社区灵感广场